Projects

Beirut Central District – Streets Infrastructure & Landscaping Utilities

Approximate area 800,0000 m2, 10 Km Roads Earthworks, Infrastructure works: Concrete Box Culverts , sewer, Storm, water supply, irrigation , firefighting , Electrical networks , street lighting, transformer Rooms, technical area, Asphalt and pavement works, Sidewalks , Street furniture, traffic light, road marking and signs.

Municipality Projects

Upgrading of Roads, sidewalks and Urban Furniture, Bedding and Pavement for Sidewalks, Supply and install Curb stone and Borders, Supply and install Lighting poles & Lighting Luminaire, Supply and install Bollards, Supply and install External signs, Supply and install Benches, Supply and install Bins

Sewage Pump Station BCD Operation & Maintenance

Operation and maintenance of Sewage pump station at SOLIDERE (24 Hours / day & 7 days), Fixing and cleaning works for the sewage pumping station and associated pipe networks, Monthly and yearly maintenance for Electro-Mechanical system 5 Pumps – Main Electrical Control Panel – Electrical connections – Generator, Cleaning and maintenance of the main sewage pit by jetting Machine and suction, Cleaning and maintenance of the Architectural and structural elements of the pump station

Sibline Landfill Phase I & II

Preparation and submittal of Project Report, Landfill Design and preparation of Execution Drawings, Construction and execution of landfill, Preparation of Environmental Impact Assessment Report (EIA), Landfill Mining - Excavation (1,000,000 m3), Operations Management, Land fill Development -Area Preparation- Treatment of landfill materials, Land Design for after use : Landscaping and agricultural works, Applying the protocol of testing and Monitoring for two years

Saida Dumpsite

Submit Design and built tender for technical and financial offer, Ground investigation Report and laboratory analysis works, Issue the Environment impact assessment for approval from the Ministry, Final Landfill Design and Construction drawings, Mobilization: Sorting plant, Laboratory, aeration unit installation, Apply aeration work, Install Odor control system, Landfill Mining work, Waste sorting and separation, Laboratory works, Testing and Analysis, Re-filling and compaction of the suitable materials, Landfill construction over 80,000 m2, Supply and install Liner and Geotextile layers, Install Gas extraction system, Install leachate collection system, treatment system and Reservoirs, Execution of Landscape area Public Park over 30,000 m2, Operation and monitoring system 1 year

Reconstruction of Nahr El Bared

Turn Key Project 28,000 m2 built up area, Construction of five blocks buildings N1, N2, N3, N4 & N5, Construction of 390 housing units and 18 shops, Excavation and concrete foundations works, Slab on grade, columns and roofs concrete works, Waterprrofing layers, Electrical and Mechanical works, Finishing : Paint, tiles, Aluminum, wooden doors, Kitchen, Mechanical and Electrical fixtures